← Back
Untu AI · Field Inspection Robotics · 2026
Revenue first. Everything else is upside.

The robot that walks
the catwalk so nobody has to.

A legged inspection platform for mines, plants and warehouses — paying customers today, not a single mandated buyer three years out.

Raising ₹5 Cr · revenue runway, not R&D runway
01
The buyer's actual problem

A technician walks a catwalk
over a live tank, at 2 a.m., alone.

Every mine, refinery and plant runs scheduled manual inspection: gauges read, leaks checked, thermal anomalies caught, by a person walking a route a wheeled robot can't follow — stairs, gantries, uneven yards, loose gravel.

24/7
Industrial sites that run inspection routes around the clock, every day of the year
Months
Sales cycle for an industrial pilot — not years, and not one single buyer
0
IDDM paperwork, export licenses, or defense-procurement gates required to sell here

This is the customer who pays this year, in a purchase order, not a customer who pays after a multi-year trial process.

Untu AI · The Boring Robot
02
Why legs, specifically

Wheels stop
where the real site starts.

Stairs and gantries — most inspection routes include at least one flight.

Uneven yards — gravel, mud, cable runs, spill containment lips.

Doorways and racking — warehouse aisles built for people, not wheeled platforms.

Existing wheeled robots already tried and stalled on exactly these routes at these sites.

Untu AI · The Boring Robot
03
The platform, today

Same robot. Different first customer.

Rumi walks untethered, on its own compute, at 0.3 m/s — designed, printed and trained in-house. The industrial version is the same hardware and the same design→simulate→train→transfer loop, aimed at inspection routes instead of border terrain.

10 months
Empty CAD file to an untethered walking robot
2
Full redesign-and-reprint cycles completed since Jul 2025
In-house
Structure, controller and tooling — no black box we depend on a vendor for

The loop that made it walk is the same loop that gets it onto a catwalk. We are not building a second robot for this market — we are pointing the first one at it.

Untu AI · The Boring Robot
04
How money arrives

We keep the robot. Customers buy the route.

Model 1

Hardware lease

Monthly fee per deployed unit — capex off the customer's books, opex on ours to sell against.

Model 2

Per-inspection billing

Priced against the manual round it replaces — the customer's existing cost is the anchor, not a number we invent.

Model 3

Site contract

Annual site-wide agreement once a pilot proves out — the recurring layer that compounds.

Every site walked, every failure mode measured, feeds back into the same policy library that improves the border-terrain and defense variants later. Industrial revenue funds the R&D the harder markets need.

Untu AI · The Boring Robot
05
The expansion path

Boring first. Then the markets everyone pitches first.

Year 1

Industrial inspection

Mines, plants, warehouses — paying pilots

Year 2

Disaster response

NDRF and utility partners — higher stakes, same platform

Year 3

Defense trials

Field-proven platform files against a live problem statement

Year 3+

Grant ladder

iDEX/ADITI/TDF non-dilutive capital, unlocked by revenue and trials both

Untu AI · The Boring Robot
06
Defense, reframed

Not the bet. The option we've already paid for.

The single-buyer risk everyone else takes on day one
  • India ordered 100 ground robots, once, in 2023 — the entire market history
  • 0 of 46 indigenous makers passed the Sept 2025 GPS-denied trial
  • Procurement cycles run in years; a startup with no revenue runs out first
What we do instead
  • Revenue-funded runway — industrial contracts pay salaries while trials run
  • Field-hardened platform — thousands of real inspection-hours before a single defense demo
  • Defense capital (₹1.39 lakh Cr mandated-domestic, plus the grant ladder) arrives as upside, not the only oxygen source
Untu AI · The Boring Robot
07
The ask

₹5 Cr to sign the first ten sites,
not to fund a decade of research.

Fund the pilot fleet, the ops team, and eight months of runway to convert three industrial pilots into paid annual contracts.

₹5 Cr · 10% · 18-month revenue milestone
Untu AI · The Boring Robot
08